What is an FF&E schedule?
An FF&E schedule lists every furniture, fixture and equipment item on a project with its room, specification, supplier, quantity, cost and lead time. It is both a design record and a procurement tool, and it is where interior design projects most often go wrong: a changed specification, a missed lead time or an order placed against an unapproved option.
Which properties should each item have?
| Property | Type | Why |
|---|---|---|
| Item ID | Text or unique ID | A stable reference such as LR-SOF-01 that survives renaming |
| Room | Relation | Groups items by space and rolls costs up to the room |
| Category | Select | Furniture, lighting, fixtures, finishes, accessories |
| Vendor | Relation | Shows every item and open order per supplier |
| Specification | Text / file | Finish, dimensions, fabric, product code, spec sheet |
| Quantity and unit cost | Number | With a formula for line total |
| Lead time (weeks) | Number | Drives order-by dates |
| Status | Status | Specified, quoted, approved, ordered, delivered, installed |
| Approved on | Date | When the client approved this exact item |
| Expected delivery | Date | Supplier-confirmed, kept separate from estimates |
How do you build it, step by step?
- 1
Create Rooms
One entry per room per project, related to Projects, with a Budget number property.
- 2
Create Selections
Add the properties above and relate each item to a Room and a Vendor.
- 3
Add a line total formula
Quantity multiplied by unit cost, so every row shows its total.
- 4
Roll costs up
On Rooms, sum the line totals of approved items and compare with the budget in a formula.
- 5
Add an order-by date
A formula that subtracts lead time from the required-on-site date tells you when to order.
- 6
Save the key views
Client gallery by room, procurement table by order-by date, and open orders grouped by vendor.
Which procurement statuses should you use?
Keep design statuses and purchasing statuses in one clear sequence. A common sequence is specified, quoted, approved, ordered, acknowledged, dispatched, delivered and installed. Never treat a design approval date as evidence that an order has been placed; the order is its own step with its own date.
How do you handle options and alternatives?
Give each option its own item, related to the same room, with an Option property (A, B, C). When the client chooses, mark the others rejected rather than deleting them. This keeps the decision history and stops a rejected option drifting into an order.
Which views make the schedule useful?
- Client presentation: gallery grouped by room, showing image, name and finish, hiding costs.
- Awaiting approval: items quoted but not approved, sorted by order-by date.
- Procurement: approved and ordered items, sorted by expected delivery.
- By vendor: open orders grouped by supplier for follow-up calls.
- Budget: table grouped by room with cost rollups against budget.
How do you share the schedule with clients?
Place the client gallery on a dedicated client page and share that page as a guest. Hide internal properties such as trade price and margin from the view, and remember that hiding a property in a view does not remove it from the underlying database; share a page that contains only client-safe content.
Frequently asked questions
- What does FF&E stand for?
- Furniture, fixtures and equipment: the movable and installed items specified for an interior.
- Can I build an FF&E schedule in Notion for free?
- Yes. Databases, relations, formulas and views all work on Notion's free plan; file upload size and guest limits depend on the plan.
- How do I calculate FF&E costs in Notion?
- Use a formula for line total (quantity × unit cost) and rollups on Rooms and Projects to sum approved items.
- Is there an FF&E template for Notion?
- Yes, including studio systems such as InteriorDesignOS and dedicated FF&E schedule templates in Notion's gallery.
- How do I track lead times in Notion?
- Store lead time in weeks and use a formula to calculate an order-by date from the date items are needed on site.
Sources
Keep reading
- Running a practiceNotion for interior designers: the complete guide to running your studioHow interior designers use Notion: projects and rooms, selections and FF&E, mood boards, client approvals, procurement, budgets and a weekly studio routine.4 min read · 17 October 2026
- Studio workflowsHow to track client approvals in Notion for design projectsTrack design approvals in Notion: an Approvals database tied to drawings and selections, dated decisions, ready-to-order checks and views for what is pending.3 min read · 17 October 2026
- Template guidesThe 5 best Notion templates for interior designers (2026)The best Notion templates for interior designers, compared: studio systems, FF&E trackers and free dashboards, with what each includes and who it suits.5 min read · 17 October 2026