Why do approvals cause disputes?
Clients approve concepts happily and dispute details later: the fabric looked different, the price changed, the lead time was longer than assumed. Without a record of what exactly was approved, when and on what information, studios absorb the cost of the disagreement.
What are the three layers?
| Layer | What the client approves | Record |
|---|---|---|
| Scheme | Direction, palette, layout concept | Dated approval of the presentation version |
| Selection | A specific item, finish, size, quantity | Approval entry linked to the item and revision |
| Ready to order | Final price, lead time, terms | Checkpoint tick with quote reference |
How do you set it up in Notion?
- 1
Create Approvals
Decision, applies to (relation to the selection item), layer, status, requested on, decided on, approved by, method and evidence link.
- 2
Add a ready-to-order checklist to Selections
Checkboxes for specification confirmed, quote current, quantity confirmed, lead time accepted.
- 3
Gate the status
Only items with all four ticked may move to ordered; a view shows items approved but not ready.
- 4
Create the client page
A shared page listing items awaiting a decision, with images, costs and the date needed.
How do you ask for decisions?
- Bundle requests into one weekly message.
- Show options with image, cost and lead time together.
- State the decision date and what it affects.
- Confirm each decision back in writing and record it the same day.
Frequently asked questions
- How do interior designers track approvals?
- With a dated approval record linked to each item, separate checks for scheme, selection and ready-to-order, and a client-facing list of pending decisions.
- What is a ready-to-order check?
- A final confirmation of specification, price, quantity and lead time before placing an order.
- How do I handle a client changing their mind?
- Refer to the dated record of what was approved and on what information, and price the change as a variation.
- Can clients approve inside Notion?
- They can comment on a shared page; confirm by email or signed form and record it in Notion.
- Should approvals be separate from the FF&E schedule?
- Keep them in their own database linked to each item so history is preserved.
Sources
Keep reading
- Studio workflowsHow to track client approvals in Notion for design projectsTrack design approvals in Notion: an Approvals database tied to drawings and selections, dated decisions, ready-to-order checks and views for what is pending.3 min read · 17 October 2026
- Studio workflowsHow to build an FF&E schedule in NotionBuild an FF&E schedule in Notion: one item per row linked to rooms and suppliers, procurement statuses, lead times, budgets, approvals and client-ready views.4 min read · 17 October 2026
- Interior designTracking vendor lead times in interior design projects with NotionStop late deliveries: track vendor lead times in Notion with order-by dates, supplier-confirmed dates, delay flags and views that show what to chase today.3 min read · 17 October 2026